For the upcoming race in Sosnová, we quickly managed to provide electricity for the riders to the depot.

The generator will be located in the center of the depot so that the distance is as fair as possible for all riders.

Only bring extension cables (220V) for the connection, which we are not able to provide for everyone.

Important info, the generator will be switched off from 0:00 to 6:00 due to night rest.

A camera system is installed in the whole area, if the connection to a place other than the one at the headquarters is found, it will be considered a gross violation and the whole team with the rider will be disqualified from the race !!

The price of electricity is included in the starting ...

Unseen in Sosnová


Team CDS